Most data centres run well below their designed power while paying for idle servers. Enter a few numbers to estimate the stranded capacity you could recover, and how much new build it could defer.

Your estate

Rough figures are fine. Every assumption can be changed.

racks
kW
%
servers
%
+Adjust assumptions
%
%
£
kW
£/kWh
kgCO₂e/kWh
£

Your estimate

Estimated value you could unlock
£1.9M
£1.6M of new build deferred, plus £312K a year in running costs.
Stranded power
400 kW
unused below your 80% target
Capacity you could reuse
45 racks
at today's average load, before building
Idle servers
240
costing £168K a year in power
Avoidable emissions
135 t
CO₂e a year from idle servers
Designed power: 1.6 MW55% used
In useStranded, up to safe targetSafety headroom

Get the full breakdown for your estate

We'll email you the numbers with the assumptions behind them, and how a verified digital twin finds the real figures.

We'll use your details to send your results and follow up about Assetspire. See our privacy policy.

How the estimate works

Stranded power

Designed power across your racks, minus what is actually drawn, up to a safe utilisation target. That gap is capacity you have already paid for but can't use, often because nobody can see where it is.

Deferred new build

The share of stranded power you could realistically reclaim, multiplied by the cost of building the same IT capacity new. Reclaiming it pushes out or avoids that capital spend.

Idle servers

Servers that are powered on but do no useful work still use energy, cooling and support contracts. We cost their power at your PUE and electricity price, plus annual support and licence costs.

This is an indicative estimate based on the figures and assumptions above, not a quote or guarantee. Actual results depend on your estate. A verified digital twin replaces these assumptions with measured data.